Project Freight
Solar, energy storage, machinery deployments and retail rollouts — projects with multiple containers, multiple stops, and often oversize or overweight equipment. One project number threads every shipment, matched to the right equipment (flatbed, step deck, lowboy/RGN) and permits where the move continues over the road, with each shipment tracked, scheduled and documented independently and rolled up under a single project view.
How it works
Containers
One or many containers open under a single project.
Loads
Freight splits into individual loads — standard dry van, flatbed, step deck or lowboy/RGN for oversize equipment — each priced and tracked on its own.
Destinations & appointments
Each load routes to its own destination with its own delivery appointment.
POD, rolled up
Proof of delivery for every load rolls up under one project view.
What is included
One project. Many controlled shipments.
A project shipment should not become a folder of unrelated orders. ShipMay uses one project number to connect the work while keeping every shipment independently scheduled, tracked and documented.
- One project number
- Multiple containers or loads
- A separate destination and appointment for each shipment
- Independent status and documents for every move
- PODs rolled up into one project view
308 Containers, One Solar Project
Houston port to a Dallas job site — 89 OOG/flat-rack loads, 100 chassis, one project view →
Equipment & Permits for Oversize Moves
When a project includes over-height, over-width, over-weight or heavy equipment, we match it to specialized trailers and coordinate the paperwork that comes with moving it over the road.
What counts as oversize / OOG?
Freight that exceeds standard dimensions or weight — over-height, over-width, over-weight loads, heavy machinery, or OOG/Open Top/Flat Rack containers that need to move by flatbed, step deck or lowboy once they leave the port.
Can I get an instant rate for an OOG shipment?
Not automatically. Equipment matching, permit requirements (they vary by state), escort needs and route height/width restrictions require review by our team per shipment before pricing.
How is project freight priced?
There's no flat rate — each load is priced individually based on equipment type and distance. When a permit is required, the carrier typically handles the application as part of that load's quoted price. We generally don't charge a separate project management fee — but when ShipMay advances a third-party charge on your behalf (for example, a port or terminal fee), a 10–20% handling fee applies for advancing that payment, with the exact percentage based on the charge type and amount — itemized in your confirmed quote before the charge is incurred. This handling fee is separate from the third-party charge itself, which is set by the supplier or terminal.
Do I need an escort vehicle, and who arranges it?
Whether an escort is optional or required is determined by the load's dimensions and the states it travels through — some states require an escort above certain width or height thresholds. When needed, the carrier typically arranges it as part of the move.
If one load in my project is delayed, does it affect the others?
Each load is tracked and scheduled independently. However, delays may affect shared site resources or downstream delivery appointments. ShipMay coordinates schedule adjustments across the project when needed.
Who's responsible for tarping and strapping oversize loads?
The carrier typically handles it, as a billed service — priced by the carrier based on load size, securement requirements and complexity, itemized in your confirmed quote.
Does permit difficulty vary by state?
Yes, significantly — some states process oversize permits quickly, others take longer or carry tighter restrictions. The carrier handles these state-by-state requirements as part of arranging your permits.
How far in advance should I book a project freight move?
Generally at least two weeks as a planning guideline, not a strict requirement — simpler moves can sometimes be arranged on shorter notice. For projects with a hard delivery deadline, the most effective approach is to plan backward from your target dates and have everything — equipment, permits, routing — lined up before the cargo ships.
What to tell us about your project
The more specific the details, the faster — and more accurate — the quote.
- Number of containers or loads, and whether they arrive together or staggered over time
- Commodity description and declared value per load
- Dimensions and weight for any oversize/overweight pieces — exact, not estimated (this determines equipment and permit requirements)
- Origin and destination for each load — may differ across the project
- Target delivery window for each load, and whether any have a hard deadline
- Whether permits have already been started on your side, or need to be handled from scratch
- Site access conditions at delivery — crane availability, ground conditions, delivery appointment restrictions
Other ways to move freight
Drayage
Container pickup from port and rail ramps, performed by qualified drayage carriers and priced by pickup terminal — port fees passed through, fuel surcharge and chassis fees itemized.
Truckload Shipping Services
Dedicated trailers for full loads, solo or team drivers, with equipment matching, rate confirmations and door-to-door tracking on every load.
Transload
The step between container freight and domestic distribution — a container arrives, gets broken down, and the freight inside continues on LTL, truckload, intermodal or last-mile. Coordinated through the platform; performed by licensed warehouse and trucking partners.
Discuss Your Project
Tell us the scope — container count, equipment, timeline — and we will put together a project view.
Where to next
Freight Services
Drayage, LTL, truckload, intermodal and last-mile — connected from container to final delivery
Rating & Pricing
NMFC, density class and accessorial validation before the quote goes out
Toolbox
ZIP, NMFC, freight class and address checks — free, no signup
Cargo Insurance
Declared value and coverage, confirmed right in the quote
Truckload (FTL)
Dry Van / Reefer / Flatbed — instant online quotes